Wetland Treatment System Saves $26 million and Wins Award

0
0

Bernardin Lochmueller & Associates (BLA) announced that the American Council of Engineering Companies (ACEC) selected on April 23, 2013 BLA’s wetland treatment system in Washington, Indiana for a 2013 Engineering Excellence Honor Award. ACEC evaluated 146 submissions and selected the Washington project as one of the 24 winners.

Like many U.S. Midwestern cities, Washington’s sanitary and stormwater system were originally combined in order to save money. However as the city grew, it didn’t have enough storage capacity and as little as 1/10 of an inch of rain caused combined-sewer overflows (CSOs) of sewage mixed with rainwater directly into waterways. The city needed to fix this, but the traditional approaches of separating sewer and stormwater pipes or adding wastewater treatment plant capacity would have cost $53 million, according to one study.

The city’s CSOs flowed into Hawkins Creek, which runs through residential neighborhoods. Between rains, the creek dried, turning gray and foul smelling. It supported no wildlife. A 2001 water quality study found unsafe levels of many contaminants, and the city posted signs warning residents that contact with the creek could make them sick.

Washington asked BLA to develop a solution that would incorporate green design to lower costs. BLA developed a system that cost $26 million less to build, when compared with the next lowest-cost alternative. The solution also cut projected annual operating costs by $1.6 million, BLA says.

Now, when it rains, the CSOs flow to a 5-mg storage tank where it’s held until the wastewater treatment plant can process it. When the tank is full, CSOs travel via two 84-inch pipes to a 27-acre constructed wetland. There, fine sediment settles in the forebay and then plants filter out contaminants. The effluent passes through a UV disinfection system before being discharged into Hawkins Creek.

In June 2012, the Indiana Department of Environmental Management (IDEM) approved the system, saying it met Washington’s Clean Water Act obligations. The system handled its first major rain events in September. Water quality tests showed that the water being discharged by the wetland system surpassed IDEM’s quality requirements, and even surpassed the more stringent standards for the city’s wastewater treatment plant, according to BLA.

You can find in a single location the top vendors of water and wastewater products and services that help you address your water and wastewater challenges and needs.
.

If you are a subscriber and want to contribute to the blog, or if you have any comments, do not hesitate to e-mail us at blogs@enviralmarkets.com. Please specify the blog that you are writing about.


Viewing all articles
Browse latest Browse all 2

Latest Images

Trending Articles





Latest Images